<!-- mobian-agent-page publisher="dailydev" canonical="https://daily.dev/posts/ai-data-centres-are-driving-up-power-bills-at-america-s-rust-belt-factories-z7jzcthtw" -->

---
title: AI data centres are driving up power bills at America’s...
description: AI data centres proliferating across the PJM grid&#x27;s 13-state region are driving sharp electricity cost increases for Rust Belt manufacturers. Capacity charges...
canonical: https://daily.dev/posts/ai-data-centres-are-driving-up-power-bills-at-america-s-rust-belt-factories-z7jzcthtw
twitter:card: summary_large_image
twitter:site: @dailydotdev
og:type: website
og:site_name: daily.dev
og:title: AI data centres are driving up power bills at America’s Rust Belt factories | daily.dev
og:description: AI data centres proliferating across the PJM grid&#x27;s 13-state region are driving sharp electricity cost increases for Rust Belt manufacturers. Capacity charges...
og:url: https://daily.dev/posts/ai-data-centres-are-driving-up-power-bills-at-america-s-rust-belt-factories-z7jzcthtw
og:image: https://api.daily.dev/og/posts/z7jZCthtW.png
og:image:alt: AI data centres are driving up power bills at America’s Rust Belt factories
og:image:width: 1200
og:image:height: 630
og:locale: en
---

> ## Documentation Index
> Fetch the complete documentation index at: https://daily.dev/llms.txt
> Use this file to discover all available pages before exploring further.

# AI data centres are driving up power bills at America’s Rust Belt factories

**[The Next Web](https://daily.dev/sources/tnw)** · 4 min read · 0 upvotes · 0 comments

## Summary

AI data centres proliferating across the PJM grid's 13-state region are driving sharp electricity cost increases for Rust Belt manufacturers. Capacity charges on the PJM grid surged over 1,000% — from $28.92 to $329.17 per megawatt-day — as data centres accounted for roughly 40% of a record $16.4 billion auction cost. Industrial electricity prices in Pennsylvania and Ohio rose 31% and 26% respectively, far outpacing the 7% national average. Manufacturers like Belden Brick saw monthly capacity charges jump from $1,600 to $12,000, while others are exploring on-site gas generation or off-peak production shifts. The grid cannot keep pace with data centre construction, and regulatory battles over who bears the cost are ongoing, creating political tension as the AI build-out conflicts with domestic manufacturing revival goals.

## Full article

daily.dev links to this article rather than hosting it. Read it at the original source: <https://thenextweb.com/news/data-centres-rust-belt-power-bills>

## Similar posts on daily.dev

- [US utilities plan to spend $1.4 trillion by 2030 to power the AI boom](https://daily.dev/posts/us-utilities-plan-to-spend-1-4-trillion-by-2030-to-power-the-ai-boom-1ndg97fqu) · The Next Web · 0 upvotes · 0 comments

---

Tags: [#manufacturing](https://daily.dev/tags/manufacturing)

[View this post on daily.dev](https://daily.dev/posts/ai-data-centres-are-driving-up-power-bills-at-america-s-rust-belt-factories-z7jzcthtw)

```json
{"@context":"https://schema.org","@graph":[{"@type":"Organization","@id":"https://daily.dev/#organization","name":"daily.dev","url":"https://daily.dev","logo":{"@type":"ImageObject","url":"https://daily.dev/apple-touch-icon.png","width":180,"height":180},"sameAs":["https://twitter.com/dailydotdev","https://github.com/dailydotdev","https://www.linkedin.com/company/daily-dev-ltd"]},{"@type":"WebSite","@id":"https://daily.dev/#website","url":"https://daily.dev","name":"daily.dev","publisher":{"@id":"https://daily.dev/#organization"},"potentialAction":{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https://daily.dev/search?q={search_term_string}"},"query-input":"required name=search_term_string"}}]}
{"@context":"https://schema.org","@type":"TechArticle","headline":"AI data centres are driving up power bills at America’s Rust Belt factories","url":"https://daily.dev/posts/ai-data-centres-are-driving-up-power-bills-at-america-s-rust-belt-factories-z7jzcthtw","mainEntityOfPage":{"@type":"WebPage","@id":"https://daily.dev/posts/ai-data-centres-are-driving-up-power-bills-at-america-s-rust-belt-factories-z7jzcthtw"},"datePublished":"2026-07-07T13:51:17.334Z","dateModified":"2026-07-07T13:51:38.294Z","description":"AI data centres proliferating across the PJM grid's 13-state region are driving sharp electricity cost increases for Rust Belt manufacturers. Capacity charges...","image":"https://media.daily.dev/image/upload/f_auto,q_auto/v1/posts/327bd0a39df4a14bdf1c9241705a638b?_a=AQAEuop","thumbnailUrl":"https://media.daily.dev/image/upload/f_auto,q_auto/v1/posts/327bd0a39df4a14bdf1c9241705a638b?_a=AQAEuop","isAccessibleForFree":true,"articleSection":"The Next Web","inLanguage":"en","publisher":{"@type":"Organization","name":"daily.dev","url":"https://daily.dev","logo":{"@type":"ImageObject","url":"https://daily.dev/apple-touch-icon.png","width":180,"height":180}},"author":{"@type":"Organization","name":"The Next Web","logo":"https://media.daily.dev/image/upload/t_logo,f_auto/v1/logos/tnw","url":"https://daily.dev/sources/tnw"},"commentCount":0,"discussionUrl":"https://daily.dev/posts/ai-data-centres-are-driving-up-power-bills-at-america-s-rust-belt-factories-z7jzcthtw","interactionStatistic":[{"@type":"InteractionCounter","interactionType":{"@type":"LikeAction"},"userInteractionCount":0},{"@type":"InteractionCounter","interactionType":{"@type":"CommentAction"},"userInteractionCount":0}],"keywords":"manufacturing","timeRequired":"PT4M"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://daily.dev"},{"@type":"ListItem","position":2,"name":"The Next Web","item":"https://daily.dev/sources/tnw"},{"@type":"ListItem","position":3,"name":"AI data centres are driving up power bills at America’s Rust Belt factories"}]}
```

