<!-- mobian-agent-page publisher="dailydev" canonical="https://daily.dev/posts/china-wants-its-green-power-wired-straight-into-the-data-centre-nlmxnwf5u" -->

---
title: China wants its green power wired straight into the data...
description: China is pushing its data centre industry to connect directly to renewable energy sources rather than drawing from a coal-heavy public grid. The flagship...
canonical: https://daily.dev/posts/china-wants-its-green-power-wired-straight-into-the-data-centre-nlmxnwf5u
twitter:card: summary_large_image
twitter:site: @dailydotdev
og:type: website
og:site_name: daily.dev
og:title: China wants its green power wired straight into the data centre | daily.dev
og:description: China is pushing its data centre industry to connect directly to renewable energy sources rather than drawing from a coal-heavy public grid. The flagship...
og:url: https://daily.dev/posts/china-wants-its-green-power-wired-straight-into-the-data-centre-nlmxnwf5u
og:image: https://api.daily.dev/og/posts/nlmxnWf5U.png
og:image:alt: China wants its green power wired straight into the data centre
og:image:width: 1200
og:image:height: 630
og:locale: en
---

> ## Documentation Index
> Fetch the complete documentation index at: https://daily.dev/llms.txt
> Use this file to discover all available pages before exploring further.

# China wants its green power wired straight into the data centre

**[The Next Web](https://daily.dev/sources/tnw)** · 3 min read · 0 upvotes · 0 comments

## Summary

China is pushing its data centre industry to connect directly to renewable energy sources rather than drawing from a coal-heavy public grid. The flagship project is a 500MW solar farm in Ningxia's Zhongwei desert, commissioned by China Datang Corp, which uses dedicated 110kV lines to supply a data centre cluster — described as the country's first large-scale direct green-power supply for computing. The full first phase pairs the solar array with a 1.5GW wind farm and storage, targeting 4.3 TWh of annual generation against a projected 2.29 TWh data centre demand. The initiative is part of Beijing's 'east data, west computing' strategy and a national goal to source roughly 80% of AI data centre power from renewables by 2030, up from about 10% in 2023. Significant challenges remain, including curtailment, grid bottlenecks, and intermittency, with the wind component still under construction and due in September.

## Full article

daily.dev links to this article rather than hosting it. Read it at the original source: <https://thenextweb.com/news/china-green-power-data-centres>

## Similar posts on daily.dev

- [China’s green-power target for AI data centres runs into the grid](https://daily.dev/posts/china-s-green-power-target-for-ai-data-centres-runs-into-the-grid-vyrcocy4d) · The Next Web · 0 upvotes · 0 comments
- [Australia’s world-first data centre rules hit their first snag: the power isn’t there yet](https://daily.dev/posts/australia-s-world-first-data-centre-rules-hit-their-first-snag-the-power-isn-t-there-yet-axjwqja3f) · The Next Web · 0 upvotes · 0 comments
- [AI's gas-plant boom, and the fight to stop it](https://daily.dev/posts/ai-s-gas-plant-boom-and-the-fight-to-stop-it-avqhuacjv) · The Next Web · 0 upvotes · 0 comments

---

Tags: [#ai-infrastructure](https://daily.dev/tags/ai-infrastructure)

[View this post on daily.dev](https://daily.dev/posts/china-wants-its-green-power-wired-straight-into-the-data-centre-nlmxnwf5u)

```json
{"@context":"https://schema.org","@graph":[{"@type":"Organization","@id":"https://daily.dev/#organization","name":"daily.dev","url":"https://daily.dev","logo":{"@type":"ImageObject","url":"https://daily.dev/apple-touch-icon.png","width":180,"height":180},"sameAs":["https://twitter.com/dailydotdev","https://github.com/dailydotdev","https://www.linkedin.com/company/daily-dev-ltd"]},{"@type":"WebSite","@id":"https://daily.dev/#website","url":"https://daily.dev","name":"daily.dev","publisher":{"@id":"https://daily.dev/#organization"},"potentialAction":{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https://daily.dev/search?q={search_term_string}"},"query-input":"required name=search_term_string"}}]}
{"@context":"https://schema.org","@type":"TechArticle","headline":"China wants its green power wired straight into the data centre","url":"https://daily.dev/posts/china-wants-its-green-power-wired-straight-into-the-data-centre-nlmxnwf5u","mainEntityOfPage":{"@type":"WebPage","@id":"https://daily.dev/posts/china-wants-its-green-power-wired-straight-into-the-data-centre-nlmxnwf5u"},"datePublished":"2026-06-25T12:12:48.697Z","dateModified":"2026-06-25T12:13:09.978Z","description":"China is pushing its data centre industry to connect directly to renewable energy sources rather than drawing from a coal-heavy public grid. The flagship...","image":"https://media.daily.dev/image/upload/f_auto,q_auto/v1/posts/91a6bb663a3aca8981a2757bc25e94fd?_a=AQAEuop","thumbnailUrl":"https://media.daily.dev/image/upload/f_auto,q_auto/v1/posts/91a6bb663a3aca8981a2757bc25e94fd?_a=AQAEuop","isAccessibleForFree":true,"articleSection":"The Next Web","inLanguage":"en","publisher":{"@type":"Organization","name":"daily.dev","url":"https://daily.dev","logo":{"@type":"ImageObject","url":"https://daily.dev/apple-touch-icon.png","width":180,"height":180}},"author":{"@type":"Organization","name":"The Next Web","logo":"https://media.daily.dev/image/upload/t_logo,f_auto/v1/logos/tnw","url":"https://daily.dev/sources/tnw"},"commentCount":0,"discussionUrl":"https://daily.dev/posts/china-wants-its-green-power-wired-straight-into-the-data-centre-nlmxnwf5u","interactionStatistic":[{"@type":"InteractionCounter","interactionType":{"@type":"LikeAction"},"userInteractionCount":0},{"@type":"InteractionCounter","interactionType":{"@type":"CommentAction"},"userInteractionCount":0}],"keywords":"ai-infrastructure","timeRequired":"PT3M"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://daily.dev"},{"@type":"ListItem","position":2,"name":"The Next Web","item":"https://daily.dev/sources/tnw"},{"@type":"ListItem","position":3,"name":"China wants its green power wired straight into the data centre"}]}
```

