<!-- mobian-agent-page publisher="dailydev" canonical="https://daily.dev/posts/more-plugs-beat-more-power-a-finnish-charger-maker-says-auud2rd6c" -->

---
title: More plugs beat more power, a Finnish charger maker says
description: A white paper from Finnish charger maker Kempower argues that connector count drives EV charging site utilisation far more than installed power. Eight-plug...
canonical: https://daily.dev/posts/more-plugs-beat-more-power-a-finnish-charger-maker-says-auud2rd6c
twitter:card: summary_large_image
twitter:site: @dailydotdev
og:type: website
og:site_name: daily.dev
og:title: More plugs beat more power, a Finnish charger maker says | daily.dev
og:description: A white paper from Finnish charger maker Kempower argues that connector count drives EV charging site utilisation far more than installed power. Eight-plug...
og:url: https://daily.dev/posts/more-plugs-beat-more-power-a-finnish-charger-maker-says-auud2rd6c
og:image: https://api.daily.dev/og/posts/AuuD2rd6c.png
og:image:alt: More plugs beat more power, a Finnish charger maker says
og:image:width: 1200
og:image:height: 630
og:locale: en
---

> ## Documentation Index
> Fetch the complete documentation index at: https://daily.dev/llms.txt
> Use this file to discover all available pages before exploring further.

# More plugs beat more power, a Finnish charger maker says

**[The Next Web](https://daily.dev/sources/tnw)** · 3 min read · 0 upvotes · 0 comments

## Summary

A white paper from Finnish charger maker Kempower argues that connector count drives EV charging site utilisation far more than installed power. Eight-plug sites reached almost 10% utilisation versus 2% for two-plug sites, while raising power from 100kW to 400kW only moved utilisation from about 3% to just over 5%. Kempower puts ideal output at around 100kW per connector, noting that cars advertising 300kW peaks typically average 100-150kW across a real charging session. The catch: EU AFIR regulations measure compliance in kilowatts and kilometres, not connector counts, meaning operators can legally satisfy requirements with fewer, larger chargers - the exact configuration the white paper says sits underused. Kempower itself builds distributed-power, multi-connector chargers, so the conclusion aligns with its own product architecture.

## Full article

daily.dev links to this article rather than hosting it. Read it at the original source: <https://thenextweb.com/news/kempower-white-paper-more-plugs-less-power-charging-utilisation-afir-kilowatt-targets-europe>

## Questions this post answers

### Does adding more charging connectors at an EV site increase utilisation more than adding more power?

Yes, according to Kempower's analytics data from North American sites, connector count correlates far more strongly with utilisation than installed power does. Utilisation rose from about 2% at two-plug sites to almost 10% at eight-plug sites, while raising power from 100kW to 400kW only moved utilisation from roughly 3% to just over 5%. Eight-plug sites delivered 128,342 kWh on average versus 61,453 kWh at four-plug sites.

_daily.dev surfaces vendor claims and independent takes on EV charging infrastructure debates like this one._

### Do EU AFIR regulations require a minimum number of EV charging connectors per site?

No, AFIR targets are written entirely in kilowatts and kilometres, not connector counts. The rule requires at least 1.3kW of public charging capacity per registered battery-electric car and 0.8kW per plug-in hybrid, plus a fast-charging pool every 60km on the trans-European core network with points of at least 150kW for cars and 350kW for heavy vehicles. Operators can meet these targets with fewer, larger chargers.

_follow how EU charging policy and infrastructure standards evolve through daily.dev for those tracking AFIR compliance._

## Similar posts on daily.dev

- [America has passed 80,000 public fast-charging ports for the first time](https://daily.dev/posts/america-has-passed-80-000-public-fast-charging-ports-for-the-first-time-memli9h14) · The Next Web · 0 upvotes · 0 comments
- [GridCars to replace decade-old chargers in national network upgrade](https://daily.dev/posts/gridcars-to-replace-decade-old-chargers-in-national-network-upgrade-jushdq0kd) · TechCentral · 0 upvotes · 0 comments
- [Tesla’s European Megacharger rollout covers 21 sites and over 100 stalls](https://daily.dev/posts/tesla-s-european-megacharger-rollout-covers-21-sites-and-over-100-stalls-qs12wnrho) · The Next Web · 0 upvotes · 0 comments
- [Geely’s new EV charger hits 2.25 megawatts](https://daily.dev/posts/geely-s-new-ev-charger-hits-2-25-megawatts-z9ocve420) · The Next Web · 0 upvotes · 0 comments
- [Winstone Jordaan on building a national EV charging network](https://daily.dev/posts/winstone-jordaan-on-building-a-national-ev-charging-network-dbuxprass) · TechCentral · 0 upvotes · 0 comments

---

[View this post on daily.dev](https://daily.dev/posts/more-plugs-beat-more-power-a-finnish-charger-maker-says-auud2rd6c)

```json
{"@context":"https://schema.org","@graph":[{"@type":"Organization","@id":"https://daily.dev/#organization","name":"daily.dev","url":"https://daily.dev","logo":{"@type":"ImageObject","url":"https://daily.dev/apple-touch-icon.png","width":180,"height":180},"sameAs":["https://twitter.com/dailydotdev","https://github.com/dailydotdev","https://www.linkedin.com/company/daily-dev-ltd"]},{"@type":"WebSite","@id":"https://daily.dev/#website","url":"https://daily.dev","name":"daily.dev","publisher":{"@id":"https://daily.dev/#organization"},"potentialAction":{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https://daily.dev/search?q={search_term_string}"},"query-input":"required name=search_term_string"}}]}
{"@context":"https://schema.org","@type":"TechArticle","headline":"More plugs beat more power, a Finnish charger maker says","url":"https://daily.dev/posts/more-plugs-beat-more-power-a-finnish-charger-maker-says-auud2rd6c","mainEntityOfPage":{"@type":"WebPage","@id":"https://daily.dev/posts/more-plugs-beat-more-power-a-finnish-charger-maker-says-auud2rd6c"},"datePublished":"2026-09-05T13:42:29.299Z","dateModified":"2026-09-05T13:42:52.577Z","description":"A white paper from Finnish charger maker Kempower argues that connector count drives EV charging site utilisation far more than installed power. Eight-plug...","image":"https://media.daily.dev/image/upload/f_auto,q_auto/v1/posts/bb8bef66a0f80cdd6136bb3bfb5fd118?_a=AQAEuop","thumbnailUrl":"https://media.daily.dev/image/upload/f_auto,q_auto/v1/posts/bb8bef66a0f80cdd6136bb3bfb5fd118?_a=AQAEuop","isAccessibleForFree":true,"articleSection":"The Next Web","inLanguage":"en","publisher":{"@type":"Organization","name":"daily.dev","url":"https://daily.dev","logo":{"@type":"ImageObject","url":"https://daily.dev/apple-touch-icon.png","width":180,"height":180}},"author":{"@type":"Organization","name":"The Next Web","logo":"https://media.daily.dev/image/upload/t_logo,f_auto/v1/logos/tnw","url":"https://daily.dev/sources/tnw"},"commentCount":0,"discussionUrl":"https://daily.dev/posts/more-plugs-beat-more-power-a-finnish-charger-maker-says-auud2rd6c","interactionStatistic":[{"@type":"InteractionCounter","interactionType":{"@type":"LikeAction"},"userInteractionCount":0},{"@type":"InteractionCounter","interactionType":{"@type":"CommentAction"},"userInteractionCount":0}],"keywords":"","timeRequired":"PT3M"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://daily.dev"},{"@type":"ListItem","position":2,"name":"The Next Web","item":"https://daily.dev/sources/tnw"},{"@type":"ListItem","position":3,"name":"More plugs beat more power, a Finnish charger maker says"}]}
{"@context":"https://schema.org","@type":"FAQPage","@id":"https://daily.dev/posts/more-plugs-beat-more-power-a-finnish-charger-maker-says-auud2rd6c#faq","mainEntity":[{"@type":"Question","name":"Does adding more charging connectors at an EV site increase utilisation more than adding more power?","acceptedAnswer":{"@type":"Answer","text":"Yes, according to Kempower's analytics data from North American sites, connector count correlates far more strongly with utilisation than installed power does. Utilisation rose from about 2% at two-plug sites to almost 10% at eight-plug sites, while raising power from 100kW to 400kW only moved utilisation from roughly 3% to just over 5%. Eight-plug sites delivered 128,342 kWh on average versus 61,453 kWh at four-plug sites. daily.dev surfaces vendor claims and independent takes on EV charging infrastructure debates like this one."}},{"@type":"Question","name":"Do EU AFIR regulations require a minimum number of EV charging connectors per site?","acceptedAnswer":{"@type":"Answer","text":"No, AFIR targets are written entirely in kilowatts and kilometres, not connector counts. The rule requires at least 1.3kW of public charging capacity per registered battery-electric car and 0.8kW per plug-in hybrid, plus a fast-charging pool every 60km on the trans-European core network with points of at least 150kW for cars and 350kW for heavy vehicles. Operators can meet these targets with fewer, larger chargers. follow how EU charging policy and infrastructure standards evolve through daily.dev for those tracking AFIR compliance."}}]}
```

