Railway has launched Metal Gen 2, a major infrastructure upgrade that delivers 5x more compute capacity, 5x more network throughput, and significantly improved CPU-to-memory ratios compared to Gen 1. The upgrade was driven by three pressures: more demanding workloads (vector DBs, AI agents, inference proxies), a RAM price tripling in late 2025, and a parabolic demand spike in Q1 2026. Gen 2 uses AMD Zen 5c EPYC CPUs with 96 cores, DDR5, 12 NVMe drives per storage box, and dual 100G ConnectX-6 NICs. Sites are live in US West, US East, and Amsterdam, with Gen 1 sites remaining operational alongside their Gen 2 partners. About 13% of Railway containers are already on Gen 2 as of June 1. Prices have not been raised, and customers should see faster deployments and more consistent performance without any configuration changes.

11m read timeFrom blog.railway.com
Post cover image
Table of contents
Table of ContentsGetting to the MetalWhere to put the boxGen 2: Stronger, Faster, DenserHow many engineers does it take to buy a server?How we're rolling it out5x more capacity, 5x more reliableAbout prices
482 Impressions