<!-- mobian-agent-page publisher="dailydev" canonical="https://daily.dev/posts/us-closes-1-9bn-loan-to-restart-the-iowa-nuclear-plant-powering-google-ym0vov1mz" -->

---
title: US closes $1.9bn loan to restart the Iowa nuclear plant...
description: The US Department of Energy has closed a $1.9 billion loan to NextEra Energy to restart the Duane Arnold nuclear plant in Iowa, which sells most of its power...
canonical: https://daily.dev/posts/us-closes-1-9bn-loan-to-restart-the-iowa-nuclear-plant-powering-google-ym0vov1mz
twitter:card: summary_large_image
twitter:site: @dailydotdev
og:type: website
og:site_name: daily.dev
og:title: US closes $1.9bn loan to restart the Iowa nuclear plant powering Google | daily.dev
og:description: The US Department of Energy has closed a $1.9 billion loan to NextEra Energy to restart the Duane Arnold nuclear plant in Iowa, which sells most of its power...
og:url: https://daily.dev/posts/us-closes-1-9bn-loan-to-restart-the-iowa-nuclear-plant-powering-google-ym0vov1mz
og:image: https://api.daily.dev/og/posts/Ym0VOV1MZ.png
og:image:alt: US closes $1.9bn loan to restart the Iowa nuclear plant powering Google
og:image:width: 1200
og:image:height: 630
og:locale: en
---

> ## Documentation Index
> Fetch the complete documentation index at: https://daily.dev/llms.txt
> Use this file to discover all available pages before exploring further.

# US closes $1.9bn loan to restart the Iowa nuclear plant powering Google

**[The Next Web](https://daily.dev/sources/tnw)** · 5 min read · 0 upvotes · 0 comments

## Summary

The US Department of Energy has closed a $1.9 billion loan to NextEra Energy to restart the Duane Arnold nuclear plant in Iowa, which sells most of its power to Google under a 25-year deal supporting its cloud and AI infrastructure. The plant, shuttered since 2020 storm damage, is expected back online around late 2028 or early 2029 pending Nuclear Regulatory Commission approval, with licensing decisions due before January 2028. It will return with 615 megawatts, enough to power nearly 500,000 homes, and is the third nuclear restart the financing office has funded, alongside Palisades and Crane Clean Energy Center. Officials claim the restart will lower electricity costs, but declined to explain how or address household bill impacts, amid broader scrutiny over who pays for AI's growing power demand.

## Full article

daily.dev links to this article rather than hosting it. Read it at the original source: <https://thenextweb.com/news/duane-arnold-nuclear-restart-1-9bn-doe-loan-google>

## Questions this post answers

### How much did the US Department of Energy lend to restart the Duane Arnold nuclear plant?

The Department of Energy's Office of Energy Dominance Financing closed a loan of up to $1.9 billion to NextEra Energy to restart Duane Arnold, Iowa's only nuclear power plant. The financial close happened on September 8, though the restart still needs Nuclear Regulatory Commission approval, with NextEra expecting the plant back online around late 2028 or early 2029.

_Follow major AI infrastructure financing deals like this one as they develop on daily.dev._

### How much power will the restarted Duane Arnold nuclear plant generate and who buys it?

Duane Arnold will return with 615 megawatts of capacity, 14 more than before its 2020 shutdown, enough to power nearly 500,000 homes. Google buys most of the output under a 25-year deal announced in October 2025, while the Central Iowa Power Cooperative buys the remainder, with only about 50 megawatts going to the cooperative according to NextEra's CEO.

_Track how AI companies secure dedicated power supplies on daily.dev._

### How many more shuttered US nuclear reactors could be restarted for data center power?

An earlier Utility Dive analysis found only one or two more US candidates after Duane Arnold, Palisades, and the Crane Clean Energy Center (formerly Three Mile Island). Those remaining plants have been closed longer and would need more work, which is pushing the industry toward new reactor construction, including small modular designs, since restarts alone cannot meet growing demand.

_Keep up with the shrinking pipeline of nuclear restarts feeding AI power demand on daily.dev._

## Similar posts on daily.dev

- [Google reportedly nears $1bn-plus nuclear power deal with Constellation](https://daily.dev/posts/google-reportedly-nears-1bn-plus-nuclear-power-deal-with-constellation-4rprqgztm) · The Next Web · 0 upvotes · 0 comments
- [Google is still aiming for its “moonshot” 2030 energy goals](https://daily.dev/posts/google-is-still-aiming-for-its-moonshot-2030-energy-goals-nbw7q39w3) · MIT Technology Review · 0 upvotes · 0 comments
- [Google’s biggest clean power project is 40 miles north of xAI’s unpermitted gas power plant](https://daily.dev/posts/google-s-biggest-clean-power-project-is-40-miles-north-of-xai-s-unpermitted-gas-power-plant-lug1sgq7g) · TechCrunch · 3 upvotes · 1 comments
- [Google adds 1GW of solar to fuel $185B AI spending spree](https://daily.dev/posts/google-adds-1gw-of-solar-to-fuel-185b-ai-spending-spree-832myhbnu) · The Register · 0 upvotes · 0 comments

---

Tags: [#google](https://daily.dev/tags/google)

[View this post on daily.dev](https://daily.dev/posts/us-closes-1-9bn-loan-to-restart-the-iowa-nuclear-plant-powering-google-ym0vov1mz)

```json
{"@context":"https://schema.org","@graph":[{"@type":"Organization","@id":"https://daily.dev/#organization","name":"daily.dev","url":"https://daily.dev","logo":{"@type":"ImageObject","url":"https://daily.dev/apple-touch-icon.png","width":180,"height":180},"sameAs":["https://twitter.com/dailydotdev","https://github.com/dailydotdev","https://www.linkedin.com/company/daily-dev-ltd"]},{"@type":"WebSite","@id":"https://daily.dev/#website","url":"https://daily.dev","name":"daily.dev","publisher":{"@id":"https://daily.dev/#organization"},"potentialAction":{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https://daily.dev/search?q={search_term_string}"},"query-input":"required name=search_term_string"}}]}
{"@context":"https://schema.org","@type":"TechArticle","headline":"US closes $1.9bn loan to restart the Iowa nuclear plant powering Google","url":"https://daily.dev/posts/us-closes-1-9bn-loan-to-restart-the-iowa-nuclear-plant-powering-google-ym0vov1mz","mainEntityOfPage":{"@type":"WebPage","@id":"https://daily.dev/posts/us-closes-1-9bn-loan-to-restart-the-iowa-nuclear-plant-powering-google-ym0vov1mz"},"datePublished":"2026-09-10T13:28:41.756Z","dateModified":"2026-10-15T02:22:20.406Z","description":"The US Department of Energy has closed a $1.9 billion loan to NextEra Energy to restart the Duane Arnold nuclear plant in Iowa, which sells most of its power...","image":"https://media.daily.dev/image/upload/f_auto,q_auto/v1/posts/f2cbf955fff268b79476ad19bcb7dc4c?_a=AQAEuop","thumbnailUrl":"https://media.daily.dev/image/upload/f_auto,q_auto/v1/posts/f2cbf955fff268b79476ad19bcb7dc4c?_a=AQAEuop","isAccessibleForFree":true,"articleSection":"The Next Web","inLanguage":"en","publisher":{"@type":"Organization","name":"daily.dev","url":"https://daily.dev","logo":{"@type":"ImageObject","url":"https://daily.dev/apple-touch-icon.png","width":180,"height":180}},"author":{"@type":"Organization","name":"The Next Web","logo":"https://media.daily.dev/image/upload/t_logo,f_auto/v1/logos/tnw","url":"https://daily.dev/sources/tnw"},"commentCount":0,"discussionUrl":"https://daily.dev/posts/us-closes-1-9bn-loan-to-restart-the-iowa-nuclear-plant-powering-google-ym0vov1mz","interactionStatistic":[{"@type":"InteractionCounter","interactionType":{"@type":"LikeAction"},"userInteractionCount":0},{"@type":"InteractionCounter","interactionType":{"@type":"CommentAction"},"userInteractionCount":0}],"keywords":"google","timeRequired":"PT5M"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://daily.dev"},{"@type":"ListItem","position":2,"name":"The Next Web","item":"https://daily.dev/sources/tnw"},{"@type":"ListItem","position":3,"name":"US closes $1.9bn loan to restart the Iowa nuclear plant powering Google"}]}
{"@context":"https://schema.org","@type":"FAQPage","@id":"https://daily.dev/posts/us-closes-1-9bn-loan-to-restart-the-iowa-nuclear-plant-powering-google-ym0vov1mz#faq","mainEntity":[{"@type":"Question","name":"How much did the US Department of Energy lend to restart the Duane Arnold nuclear plant?","acceptedAnswer":{"@type":"Answer","text":"The Department of Energy's Office of Energy Dominance Financing closed a loan of up to $1.9 billion to NextEra Energy to restart Duane Arnold, Iowa's only nuclear power plant. The financial close happened on September 8, though the restart still needs Nuclear Regulatory Commission approval, with NextEra expecting the plant back online around late 2028 or early 2029. Follow major AI infrastructure financing deals like this one as they develop on daily.dev."}},{"@type":"Question","name":"How much power will the restarted Duane Arnold nuclear plant generate and who buys it?","acceptedAnswer":{"@type":"Answer","text":"Duane Arnold will return with 615 megawatts of capacity, 14 more than before its 2020 shutdown, enough to power nearly 500,000 homes. Google buys most of the output under a 25-year deal announced in October 2025, while the Central Iowa Power Cooperative buys the remainder, with only about 50 megawatts going to the cooperative according to NextEra's CEO. Track how AI companies secure dedicated power supplies on daily.dev."}},{"@type":"Question","name":"How many more shuttered US nuclear reactors could be restarted for data center power?","acceptedAnswer":{"@type":"Answer","text":"An earlier Utility Dive analysis found only one or two more US candidates after Duane Arnold, Palisades, and the Crane Clean Energy Center (formerly Three Mile Island). Those remaining plants have been closed longer and would need more work, which is pushing the industry toward new reactor construction, including small modular designs, since restarts alone cannot meet growing demand. Keep up with the shrinking pipeline of nuclear restarts feeding AI power demand on daily.dev."}}]}
```

